Asphalt Companies Oklahoma

Napco Construction Construction company

329 S Eagle Ln
Oklahoma City
OK 73128

meta_full_address

(405) 495-6501

Napco Construction
329 S Eagle Ln, Oklahoma City, OK 73128

(405) 495-6501
https://www.google.com/maps/dir//Napco+Construction,+329+S+Eagle+Ln,+Oklahoma+City,+OK+73128/data=!4m6!4m5!1m1!4e2!1m2!1m1!1s0x87b20f05aad8dbc3:0xc1bca13f5a34429?sa=X&ved=1t:57443&hl=en&gl=us&ictx=111

Google Reviews:

3.4

Name: David Alder
Rating: 5
Review: This was the second time we’ve used Napco for repairs going through our insurance company. We are very happy with the results. The staff are friendly and able to answer our questions satisfactorily. Jeremiah is a hoot to work with. The roof and ceilings look fantastic.
Date: a week ago

Name: Kim Miller
Rating: 5
Review: I had damage in my kitchen from a fire and my insurance company recomended Napco. They did a great job restoring my cabinets, painting the ceiling and walls and installing the new appliances. I have recomended them to friends and would definitely use them again.
Date: 6 months ago

Name: Laura Carlson
Rating: 5
Review: My parents house flooded over Thanksgiving in 2021 and it was nightmare after nightmare trying to find a contractor who actually would help repair the water damages; actually show up when they said & Napco was the only ones who helped them throughout the process. Yes, there were delays but it was no one’s fault on either end as there was a lot of decisions to be made, materials to be ordered and labor to be found. The house looks so great now and every person made it so much less stressful. Can’t recommend them enough!!!!
Date: a year ago

Name: Dana Kelso
Rating: 1
Review: I had a water leak in my bathroom and filed an insurance claim 5/30/2020! This ended up being an entire bathroom remodel that should have been finished much sooner. Their office manager Linda forgets to do things and doesn't follow through. She is genuinely a nice person. I feel she is overworked and doesn't have enough office support staff, especially when I had to take over to get phone cala made at her request to connect the subs to schedule meetings. I waited two months to speak with Jeremiah about possible upgrades, only to be told most of my idea wasn't possible, but raising the ceiling was. He never sent an estimate and his guys showed up to do the work. He ended up covering that expense and then there was so much rot in the walls from the leak, they ended up opening the wall I asked about opening and never got the bid to do. Now, they are telling the insurance company I made them do it and it took the job over budget. I am now waiting on the last item, the shower doors. They asked ME to call a glass.company to get an estimate. I did two months ago. This week, they told me it was over budget without sending any other options or a supplement to the insurance company. They didn't want to handle the floor replacement and told me the budget I had to work with. I called Lowe’s and had the job completed in 2 days once I found flooring that worked with the budget. I'm still waiting on reimbursement. They want me to sign over the entire reimbursement check before the job is finished before paying me. Meanwhile, the USAA adjuster barely returns calls or pays attention to what is happening. Is this normal? I've had a eolf replaced and 2 slab leaks and never experienced such delays. Yes, there were weather deals, but the job should have been finished LONG before February, 2021. They twist my words to make me feel like it's “what I chose” and “i wanted” but they are the ones that guided me through the process and didn't offer other solutions or tell me anything might cost more, except for one $15 molded board behind my toilet. That delay was almost 2 months!!
Date: 3 years ago

Name: Judy Kay
Rating: 1
Review: I should have left this review about 4 years ago. It came up on my time line and I remember how irritating it was to deal with them. If you need a general contractor DO NOT call Napco! All they did was waste my time. I took off work after THEY called me and I decided to call them back, they came out, went all through the house, assured me this was the type of work they did, and Bart (one of the owners) said he would work up a bid. Then when I call a week later to see where they were on the bid, they said they just didn't think this was a job they could handle right now? What????
Date: 3 years ago

35.4620812 -97.6627111

https://maps.google.com/?cid=872513139900630057

Scroll to Top
Asphalt Company Oklahoma